    電壓擊穿試驗(yàn)儀操作步驟:

    1、試驗(yàn)前的準(zhǔn)備:1)打開試驗(yàn)機(jī)右側(cè)的總電源開關(guān),預(yù)熱15分鐘。2)打開計算機(jī)進(jìn)入Windows系統(tǒng)。雙擊本儀器軟件的快捷圖標(biāo)打開試驗(yàn)登錄界面輸入登錄密碼即可進(jìn)入試驗(yàn)界面。

    2、交直流試驗(yàn)的切換1)本儀器高壓輸出為交流電壓。直流的獲得方式為在原回路中串入高壓硅堆,使測試回路為脈動的直流電壓。實(shí)現(xiàn)的過程為,硅堆已經(jīng)在高壓變壓器的高壓絕緣塔中,平時用一個短路桿把高壓硅堆短接。需要直流試驗(yàn)時,取出短路桿,使高壓硅堆接入測試電路中,這時回路的電壓為脈動的直流電壓。

    2)前面板直流交流選擇按鈕。該按鈕的狀態(tài)不能改變設(shè)備輸出的電壓性質(zhì)。按下該按鈕,設(shè)備僅僅是把直流報警電路接入。指示用戶,當(dāng)打開箱門時,您需要對高壓均壓球放電。轉(zhuǎn)動放電桿,使放電桿的端部銅球接觸高壓均壓球。建議用戶每次放電銅球接觸高壓均壓球時間大于五秒。

    3)試驗(yàn)的交直流電壓切換,主要取決于高壓絕緣塔中的短路桿是否取出。當(dāng)取出短路桿時,高壓均壓球上的電壓為直流電壓,插入短路桿時,高壓均壓球上的電壓為交流電壓。短路桿的取出、插入?yún)⒖醋髠?cè)的示意圖。

    4)在直流試驗(yàn)時,計算機(jī)也要選擇直流狀態(tài),否則測的結(jié)果是不正確的。簡單的說,交流電壓與直流電壓有倍的關(guān)系。

     

    電壓擊穿試驗(yàn)儀是高壓輸出設(shè)備,安裝搬動使用應(yīng)特別注意人身與設(shè)備的安全。請注意以下事項:

    1 設(shè)備務(wù)必接16A單相220V交流電插座。

    2 設(shè)備兩個接地端子之一務(wù)必通過地線導(dǎo)線接配電箱的地線。

    3使用前,設(shè)備兩個接地端子之一務(wù)必接放電棒。

    4 試驗(yàn)中,觀察檢測電流如果長時間維持在20-30mA,應(yīng)立即停止試驗(yàn),以免負(fù)載過大燒毀保險管。

    5 一次試驗(yàn)完畢,務(wù)必先斷掉電源,再用放電棒放掉高壓輸出端的剩余電荷。

    6 如遇緊急情況,應(yīng)立即按壓“急停”按鈕斷電。

    7 長時間不用,斷開所有電源線。

    8 搬運(yùn)時不能傾斜角過大,以免變壓器油流出。

    9 換試樣前,確保已經(jīng)用放電棒放過電,且電源處于斷開狀態(tài)。

    10 測試過程如遇試樣著火,務(wù)必先斷電源,后滅火。

     

     

    Operation procedure of voltage breakdown tester:
    1. Preparation before test: 1) open the main power switch on the right side of the test machine and preheat for 15 minutes. 2) turn on the computer and enter the Windows system. Double click the instrument software shortcut icon, open the test login screen, enter the login password, you can enter the test interface.
    2 、 AC and DC test switch 1) this instrument high voltage output is AC voltage. The way to obtain DC is to connect the high voltage silicon stack into the original circuit, so that the test circuit is a pulsating DC voltage. The implementation process, has been in a high voltage silicon stack transformer insulation tower, usually with a short rod, short circuit high-voltage silicon stack. When the DC test is needed, the short circuit rod is removed so that the high voltage silicon stack is connected to the test circuit, and the voltage of the circuit is a pulsating DC voltage.
    2) front panel DC AC select button. The status of the button cannot change the voltage characteristic of the device output. Press this button, the device is only to connect the DC alarm circuit. Instructs the user when you open the door of the box, you need to discharge the ball evenly under high pressure. Turn off the pole so that the end of the pole is in contact with the high-pressure ball. It is recommended that each user discharge copper balls in contact with high pressure equal pressure ball for more than five seconds.
    3) the AC / DC voltage switching of the test mainly depends on whether the short rod in the high voltage insulated tower is taken out. When the short circuit rod is taken out, the voltage on the ball is a direct current voltage, and when the short circuit rod is inserted, the voltage on the high voltage equalizing ball is an alternating voltage. Take out the short pole and insert it. See the diagram on the left.
    4) in the DC test, the computer should also choose the DC state, otherwise the result of measurement is incorrect. In brief, the AC voltage is twice as much as the DC voltage.
    Voltage breakdown test instrument is a high voltage output device. Installation, movement and use should pay special attention to the safety of people and equipment. Please note the following:
    1 equipment must be connected to 16A single-phase 220V AC socket.
    2 one of the two grounding terminals of the equipment must be connected to the ground wire of the distribution box through a dedicated earth wire.
    3 before use, one of the two grounding terminals must be connected with the discharge rod.
    4 in the test, if the observation current is maintained at 20-30mA for a long time, the test should be stopped immediay so as not to overload the fire tube.
    5 a test finished, be sure to unplug the residual charge and then put off the high voltage output end of the bar.
    6, in case of emergency, should immediay press "emergency stop" button, power failure.
    7 do not use for a long time, disconnect all power lines.
    8, handling can not tilt too large angle, so as not to transformer oil flow.
    In 9 samples, make sure you've let the electric discharge rod, and the power is disconnected.
    10 test process, in case of fire, be sure to break the power supply, and then extinguish the fire.

     

     

    重點(diǎn)詞匯釋義

    • 擊穿試驗(yàn)breakdown test; flash (ing) test; spark-over test; disruptive test
    • 操作步驟operating steps
    • 快捷圖標(biāo)short-cut icon
    • 交流電壓alternating voltage
    • 高壓硅堆high voltage silicon rectifier stack; high-voltage silicon stack
    • 測試回路test loop; testing loop
    • 直流電壓volts d.c.; direct voltage
    • 高壓變壓器high tension transformer; high-voltage transformer (HVT); high voltage transformer
    • 高壓絕緣high-voltage insulation; high voltage insulation
    • 測試電路test circuit; test connection
    聯(lián)系人:陳丹
    手機(jī):
    18911395947
    點(diǎn)擊這里給我發(fā)消息
     
    亚洲综合av永久无码精品一区二区 | 狠狠色婷婷狠狠狠亚洲综合| 亚洲成AV人片在WWW色猫咪| 亚洲日产2021三区| 亚洲成A人片在线观看无码3D| 日韩亚洲Av人人夜夜澡人人爽 | 亚洲精品美女久久7777777| 久久精品国产精品亚洲| 在线播放亚洲精品| 亚洲高清不卡视频| 国产日韩成人亚洲丁香婷婷| 亚洲精品视频久久久| 亚洲夂夂婷婷色拍WW47| 亚洲AV无码乱码在线观看裸奔 | 亚洲熟妇中文字幕五十中出| 久久久久亚洲av成人无码电影 | 亚洲av乱码一区二区三区香蕉| 亚洲日韩激情无码一区| 亚洲宅男天堂在线观看无病毒| 国产亚洲成归v人片在线观看| 亚洲一区二区三区无码影院| 亚洲第一男人天堂| 久久综合亚洲色一区二区三区 | 另类小说亚洲色图| 国产成人亚洲毛片| 亚洲国产精品成人网址天堂| 亚洲国产成人久久综合野外| 亚洲精品无码AV中文字幕电影网站| 亚洲第一页日韩专区| 亚洲精品国产V片在线观看| 久久久久国产成人精品亚洲午夜 | 久久亚洲AV无码西西人体| 国外亚洲成AV人片在线观看| 久久无码av亚洲精品色午夜| 亚洲av片不卡无码久久| 亚洲粉嫩美白在线| 亚洲AV成人一区二区三区观看| 国产成人精品日本亚洲专一区| 精品无码一区二区三区亚洲桃色| 亚洲精品亚洲人成在线麻豆| 亚洲午夜久久影院|